|
John and Pete discuss the drill scenarios. | |
|
FF John Kurtin sitting down on the job as FF John Kobus and Technician Carter watch the pump. | |
|
FF Kurtin gives the supply pumper scenario a try. The supply line from ER-10 is already on the ground and the hydrant is wrapped. | |
|
Engine 1 approaches the hydrant... | |
|
FF Kurtin unwraps the hydrant... | |
|
and opens the steamer... | |
|
With the Humat Valve attached to the Hydrant, he begins to put additional hose in place... | |
|
Meanwhile, ER-10 is flowing water fast and furious....will FF Kurtin be able to supply them before they run out of water??? | |
|
Looks like he made it...the supply line looks charged. | |
|
Everything appears to be in place...nice job for a rookie! | |